ALTERNATIF PEMILIHAN JENIS PONDASI PADA KONDISI DAERAH RAWAN GEMPA DAN TSUNAMI

Hilma Erliana, Enny Irmawati Hasan

Abstract


Abstract

The earthquake and tsunami disaster that occurred in Aceh Province had a major impact on infrastructure such as infrastructure damage, building collapse, and structural damage to buildings. Lessons from the disaster have changed the public understanding of good and safe building structures, by considering the earthquake-resistant design of building. The scope of this research is related to the selection of the right and safe foundation. This study aims to find out the right steps in deciding to determine which foundation is suitable for use, by considering the safety of the surrounding community. This research is located in the construction of the Batoh Health Center Building in Banda Aceh by looking at the appropriate criteria in determining the alternative choices of the earthquake-resistent design of foundations using the AHP (Analytical Hierarchy Process) method. The criteria used in determining alternative foundation selection are economic aspects, implementation aspects, environmental aspects, soil conditions, and field conditions. The types of foundations that are used as an alternative choice are hydraulic jack-in system pile foundations, bored pile foundations, and the foundation of the cobwebs (KSLL). Based on the results of the study, the criteria weight values were from the highest to the lowest order, namely the soil condition aspect 0.51, the economic aspect 0.27, the implementation aspect 0.12, the environmental aspect 0.06, and the field condition aspect 0.04. The alternative choice of the right foundation for use in the construction of the Batoh Health Center UPTD Building in Aceh Province is the cobweb construction foundation (KSLL), with the priority order of the alternative choices namely the Cobweb Foundation (KSLL) 0.58, the drill system pile foundation (Bored Pile) with a weight of 0.22 and the last is the foundation of a hydraulic jack-in system of 0.19

Keywords:

foundation selection; AHP method; earthquake-resistant.

__________________________

 

Abstrak

Pengalaman yang telah dialami oleh masyarakat khususnya pada Provinsi Aceh terhadap bencana gempa dan tsunami seperti kerusakan infrastruktur, keruntuhan bangunan dan kerusakan struktural bangunan. Belajar dari pengalaman tersebut, maka telah mengubah pandangan masyarakat dalam penanganan pembangunan struktur bangunan yang baik dan aman, dengan mempertimbangkan kondisi bangunan yang ramah gempa. Maka dari itu dilakukan penelitian mengenai pemilihan pondasi yang tepat dan aman. Penelitian ini bertujuan untuk mengetahui bagaimana langkah yang tepat dalam mengambil keputusan untuk menentukan pondasi mana yang layak dipakai, dan juga mempertimbangkan keamanan masyarakat disekitar. Lokasi penelitian pada pembangunan Gedung Puskesmas Batoh Banda Aceh dengan melihat kriteria-kriteria yang sesuai dalam menentukan alternatif pilihan pondasi ramah gempa dengan menggunakan metode AHP (Analytical Hierarchy Process). Adapun kriteria yang digunakan dalam menentukan alternatif pemilihan pondasi yaitu aspek ekonomis, aspek pelaksanaan, aspek lingkungan, kondisi tanah dan kondisi lapangan. Jenis pondasi yang menjadi alternatif pilihan adalah pondasi tiang pancang sistem hidrolik (hydraulick Jack In), pondasi tiang sistem bor (Bored Pile) dan pondasi Sarang laba-laba (KSLL). Berdasarkan hasil penelitian didapat nilai bobot kriteria dengan urutan paling tinggi hinga paling rendah yaitu kondisi tanah 0,51, aspek ekonomis 0,27, aspek pelaksanaan 0,12, aspek lingkungan 0,06 dan aspek kondisi lapangan 0,04. Untuk alternatif pilihan pondasi yang tepat untuk digunakan dalam pembangunan Gedung UPTD Puskesmas Batoh Provinsi Aceh adalah pondasi konstruksi sarang laba-laba (KSLL), dengan urutan prioritas alternatif pilihan yaitu pondasi Sarang laba-laba (KSLL) 0,58, pondasi tiang sistem bor (Bored Pile) dengan bobot 0,22 dan yang terakhir adalah pondasi tiang pancang sistem hidrolik (hydraulick Jack In)  0,19.

Kata Kunci:

Pemilihan pondasi; Metode AHP; Ramah Gempa;

 


Keywords


Pemilihan pondasi; Metode AHP; Ramah Gempa; Pemilihan pondasi; Metode AHP; Ramah Gempa;

Full Text:

PDF

References


REFERENSI

Asadabadi, M. R., Chang, E., & Saberi, M. (2019). Are MCDM methods useful? A critical review of analytic hierarchy process (AHP) and analytic network process (ANP). Cogent Engineering, 6(1), 1623153.

Badri Ahmadi, H., Hashemi Petrudi, S. H., & Wang, X. (2017). Integrating sustainability into supplier selection with analytical hierarchy process and improved grey relational analysis: a case of telecom industry. The International Journal of Advanced Manufacturing Technology, 90, 2413–2427.

Balali, V., Zahraie, B., & Roozbahani, A. (2014). A comparison of AHP and PROMETHEE family decision making methods for selection of building structural system. American Journal of Civil Engineering and Architecture, 2(5), 149–159.

Caksono, E. T., & Mu’afata, A. Y. (2002). Evaluasi Pemilihan Jenis Pondasi pada Proyek Janti Fly Over dengan Metode AHP.

Erliana, H., Agustian, K., Yusra, C. L., & Hasan, E. I. (2022). PENENTUAN JALUR EVAKUASI HORIZONTAL MENGGUNAKAN ANALISIS SKALA PRIORITAS PEMILIHAN ALTERNATIF RUAS JALAN PADA KABUPATEN ACEH BARAT. Jurnal Arsip Rekayasa Sipil Dan Perencanaan, 5(4).

Hartono, W., Sugiyarto, S., & Lanjari, L. (2016). Pemilihan Alternatif Jenis Pondasi Dengan Menggunakan Metode Analytical Hierarchy Process (AHP)(Studi Kasus Proyek Pembangunan Laboratorium Fakukultas Pertanian UNS Surakarta). Matriks Teknik Sipil, 4(2).

Iqbal Hasan, M. M. (2002). Pokok-pokok Materi Teori Pengambilan Keputusan. Jakarta: Ghalia Indonesia.

Jawat, I. W., Gita, P. P. T., & Dharmayoga, I. M. S. (2020). Kajian Metoda Pelaksanaan Pekerjaan Pondasi Bored Pile Pada Tahap Perencanaan Pelaksanaan. PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 9(2), 126–142.

Jawat, W. (2016). Metode Pelaksanaan Pekerjaan Tiang Pancang Sistem Hidraulic Jack In (Studi: Proyek KCU BCA Sunset Road Bali). PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 5(1), 43–52.

Luhur IV, J. P., & Duwur–Semarang, B. (n.d.). ANALISA STUDI PENGGUNAAN AHP PADA PENGAMBILAN KEPUTUSAN PEMILIHAN JENIS SUB STRUKTUR PADA PROYEK KONSTRUKSI.

Magfira, D., Arifin, B., & Rahayu, A. (n.d.). Perencanaan Alternatif Pondasi Konstruksi Sarang Laba-laba pada Palu Grand Mall. JOURNAL TEKNIK SIPIL DAN INFRASTRUKTUR, 4(1).

Palbeno, W., Rasidi, N., & Pandulu, G. D. (2018). Perencanaan Gedung Perkuliahan 3 lantai dengan Pondasi Sarang Laba-laba di Universitas Timor (TTU). Reka Buana: Jurnal Ilmiah Teknik Sipil Dan Teknik Kimia, 3(1), 59–66.

Purwanto, S. S. (2012). Konstruksi Pondasi Sarang Laba-Laba Atas Tanah Daya Dukung Rendah Bangunan Bertingkat Tanggung. Jurnal Teknik Sipil, 12(1), 51–60.

Rahmatika, S. (2016). Analisis Daya Dukung dan Penurunan Pondasi Oil Storage Tank pada Proyek Pembangunan Terminal Transit Baubau di Sulawesi.

Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of Services Sciences, 1(1), 83–98.

Seni, W., Ismail, N., & Ismail, A. B. (2015). Pendidikan Mitigasi Bencana Berbasis Lingkungan Masyarakat Terhadap Jalur Evakuasi Gempa Bumi Berpotensi Tsunami (Studi Kasus Kecamatan Kuta Alam Kota Banda Aceh). BIOTIK: Jurnal Ilmiah Biologi Teknologi Dan Kependidikan, 1(2), 93–102.

Skibniewski, M. J., & Chao, L.-C. (1992). Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), 577–593.

Tantyonimpuno, R. S., & Retnaningtias, A. D. (2009). Penerapan Metode Analytical Hierarchy Process (AHP) Pada Proses Pengambilan Keputusan Pemilihan Jenis Pondasi (Studi Kasus: Proyek Pembangunan Royal Plaza Surabaya). Jurnal Teknik Sipil Unika Soegijapranata, 3(2), pp-77.

Yeh, H., Barbosa, A. R., Ko, H., & Cawley, J. G. (2014). Tsunami loadings on structures: Review and analysis. Coastal Engineering Proceedings, 1(34), 4.




DOI: https://doi.org/10.38038/vocatech.v4i2.113

Refbacks

  • There are currently no refbacks.


VOCATECH : Vocational and Technology Journal
Unit Penelitian dan Pengabdian Masyarakat & Penjaminan Mutu
Akademi Komunitas Negeri Aceh Barat
Komplek STTU Alue Peunyareng, Ujong Tanoh Darat, Meureubo, Kabupaten Aceh Barat, Aceh 23615
Telp. (0655) 7110271
Email: vocatech@aknacehbarat.ac.id


VOCATECH: Vocational Education and Technology Journal Published by:
Unit Penelitian dan Pengabdian Masyarakat & Penjaminan Mutu
Akademi Komunitas Negeri Aceh Barat


Indexed by:

GS2 logoCrossref logoGaruda logosinta-5 logosinta-5 logo

Creative Commons License logo

VOCATECH: Vocational Education and Technology Journal Creative Commons Attribution-ShareAlike 4.0 International License.